top of page
All Categories

01:28

00:20

02:16

01:58

02:00

01:25

01:05

01:37
All Posts


El. Venizelou 290, Kallithea — Feasibility Report
KALLITHEA · SOUTH ATHENS · GREEK GOLDEN VISA · INVESTMENT FEASIBILITY El. Venizelou 290, Kallithea — Feasibility Report El. Venizelou 290 is a new-build development in the heart of Kallithea, one of Athens' fastest-growing districts, ideally positioned between the historic city centre and the Athens Riviera. Across seven floors it delivers 22 residences — eighteen apartments and four maisonettes — with contemporary architecture, energy-efficient systems and an exceptional urb

M. Sami Akbeniz
Jul 112 min read


Liviis 20 Glyfada — Feasibility Report
ANO GLYFADA · ATHENS RIVIERA · ENTRY-LEVEL INVESTMENT FEASIBILITY Liviis 20 Glyfada — Feasibility Report Liviis 20 is a five-floor new-build development on a quiet residential street in Ano Glyfada, one of the Athens Riviera’s most sought-after districts. The featured unit — top-floor Loft 6.1 — is an entry-level opportunity priced at €190,000, combining a compact, efficient interior with an exceptionally generous private roof terrace and sea view. The Asset Metric Detail Uni

M. Sami Akbeniz
Jul 82 min read


Greek Golden Visa Requirements & Documents Checklist (2026)
Complete 2026 checklist of Greek Golden Visa requirements and documents: eligibility, the property investment, source of funds, and every paper you must translate and apostille.

M. Sami Akbeniz
Jul 62 min read


How Long Does the Greek Golden Visa Take? Processing Time & Timeline (2026)
The Greek Golden Visa takes about 4–6 months from engagement to biometrics with a clean file. Full 2026 timeline stage by stage, what speeds it up, and current backlog status.

M. Sami Akbeniz
Jul 62 min read


Aegina Project — Feasibility Report
AEGINA ISLAND · SARONIC GULF · GREECE GOLDEN VISA · INVESTMENT FEASIBILITY Aegina Project — Feasibility Report Aegina Project is a residential development of 9 ground-floor apartments in the heart of Aegina Island, a 10-minute walk from Aegina Town and the port. Built in 2010 and fully renovated in 2025, the project blends traditional island architecture with contemporary comfort, and every apartment comes with a dedicated parking space. Our thesis is clear: the project is co

M. Sami Akbeniz
Jul 62 min read
bottom of page
