top of page

Nuvia UrbanStay Moschato | A0145 Feasibility Report

Updated: 3 days ago

MOSCHATO (BETWEEN ATHENS CENTRE AND THE RIVIERA, NEAR THE COAST) · ATHENS · GREECE GOLDEN VISA PROGRAMME

Eleftheriou Venizelou 90 — Moschato 2nd & 3rd

The Eleftheriou Venizelou 90 — Moschato 2nd & 3rd project — a new-build addition of 18 apartments (16x 1+1 + 2x 2+1) on the 2nd and 3rd floors of an existing building (former office use). Under the Law No. 5100/2024 αλλαγή χρήσης (επαγγελματικό/γραφεία → κατοικία) mechanism, the €250,000 GV threshold applies; the new floors added on top of the existing building, within the limit of the area's zoning plan συντελεστής δόμησης (KAKS / floor area utilisation coefficient), are part of this package. Legal completion is achieved via αναθεώρηση οικοδομικής άδειας; as long as the area's zoning plan (NOK 4067/2012) is within the KAKS limit, the new floors are included in the GV package. Pricing is €258-364K, and all units are GV-compliant.


Quick Overview


  • Entry price:€258,000 – €364,000 · apartments 38-52 m² interior / 49-94 m² total (with balconies)

  • Unit types:1+1 (16 units) + 2+1 (2 units)

  • Inventory:18 units

  • Rental guarantee:No guarantee stated in the brochure — demand in Moschato, between Athens and the Riviera, is strong

  • Golden Visa:5-year renewable residence permit + Schengen free movement

  • Energy:A (heating: Heat Pumps)

  • Delivery:2028 Q2 (2nd Quarter 2028)


01Executive Summary & Area Analysis


Moschato is a rapidly evolving coastal neighbourhood located between central Athens and the Athens Riviera, within the sphere of influence of the Stavros Niarchos Foundation Cultural Center (SNFCC). A blend of rich history, contemporary living and a growing local culture — cafés, boutique shops and an art scene — has drawn an upper-middle-income professional rental base to the district over the past 5 years. The SNFCC is 2.6 km away and the coast 1.8 km — it is located right next to the Faliro Bay regeneration axis (Aenaon Mediterranean Park).


Accessibility Index


DESTINATION

TRANSPORT

TIME

Metro Station

On foot

9 min (700 m)

School

On foot

~5 min

Shops & Restaurants

On foot

~3 min

Coast (start of the Athens Riviera)

By car

~5 min (1.8 km)

Stavros Niarchos Foundation (SNFCC)

By car

~7 min (2.6 km)

Hospital

By car

~10 min

Port of Piraeus

By car

8 min

Athens City Centre

Metro/Car

5 min

Glyfada Marina

By car

~20 min

Athens Airport

By car

35 min


02Legal Framework & Project Description


Law No. 5100/2024 — αλλαγή χρήσης (επαγγελματικό/γραφεία → κατοικία) + Scope of floor addition within KAKS


A new-build addition of 18 apartments (16x 1+1 + 2x 2+1) on the 2nd and 3rd floors of an existing building (former office use). Under the Law No. 5100/2024 αλλαγή χρήσης (επαγγελματικό/γραφεία → κατοικία) mechanism, the €250,000 GV threshold applies; the new floors added on top of the existing building, within the limit of the area's zoning plan συντελεστής δόμησης (KAKS / floor area utilisation coefficient), are part of this package. Legal completion is achieved via αναθεώρηση οικοδομικής άδειας; as long as the area's zoning plan (NOK 4067/2012) is within the KAKS limit, the new floors are included in the GV package. Pricing is €258-364K, and all units are GV-compliant.


Project Highlights


  • New-build addition of 2nd + 3rd floors to the existing building (18 apartments)

  • 16 units of 1+1 (38-44 m²) + 2 units of 2+1 (52 m²)

  • Class A Energy Rating + Heat Pumps heating

  • Grohe fixtures + European kitchen

  • Balcony-rich layout (8-39 m² balcony/terrace)

  • 39 m² wide terrace in units 3.6 and 3.7

  • SNFCC 2.6 km + coast 1.8 km

  • Metro 700 m + airport 30 min (32 km)

  • 2028 Q2 delivery


03Risk Analysis, SWOT & Conclusion


STRENGTHS (S)

• Starting point of the Athens Riviera — coast 1.8 km • SNFCC sphere of influence — Faliro Bay regeneration halo • Class A energy + Heat Pumps + Grohe + European kitchen • Low entry threshold €258K — GV-compliant • Units with wide balconies (3.6/3.7: 39 m² terrace) • Covered by the αλλαγή χρήσης €250K exemption • Mid-sized inventory of 18 apartments — flexible price point

WEAKNESSES (W)

• 2028 Q2 delivery — long capital lock-up period • Parking N/A (brochure) • 9 min walk to the metro (700 m) — medium distance • Upper units (€350-364K) above the GV threshold • Conversion on top of an existing building — there may be structural limitations

OPPORTUNITIES (O)

• Faliro Bay regeneration (Aenaon Park) premium transfer • SNFCC sphere of influence, 6%+ annual increase • Central Athens, 5.5%+ annual value appreciation • Hellinikon mega-project halo effect • Schengen + 7-year path to citizenship • Family inclusion (spouse + child + parents) advantage • Gateway to the Athens Riviera for Turkish investors

THREATS (T)

• The GV threshold may rise in the future (acquired rights are protected) • EUR/TRY exchange-rate volatility • Lack of parking — eliminates some tenants • Trend toward tighter Airbnb regulation • Issues with building on top of the existing structure (long delivery time) • Potential European macroeconomic shock


CONCLUSION & INVESTMENT DECISION

Investment decision:POSITIVE Riviera


Eleftheriou Venizelou 90 Moschato is an αλλαγή χρήσης project located at the starting point of the Athens Riviera, within the sphere of influence of the Stavros Niarchos Foundation Cultural Center (SNFCC). The new-build addition of 18 apartments (16x 1+1 + 2x 2+1) on the 2nd + 3rd floors of the existing building (former office use) is being carried out within the limit of the area's zoning plan συντελεστής δόμησης (KAKS). It is offered together with premium technical equipment: Class A energy rating + Heat Pumps + Grohe fixtures + European kitchen. With a €258K entry threshold, it is one of the most affordable coastal GV alternatives under the αλλαγή χρήσης €250K mechanism; with the coast 1.8 km away, the SNFCC 2.6 km away and the Port of Piraeus 10 minutes away, its location gradually feeds the investor from the Riviera premium-transfer mechanism. The 39 m² wide terrace in units 3.6 and 3.7 attracts upper-segment tenants/buyers. The 2028 Q2 delivery timeline requires a medium-to-long-term capital lock-up; timing aligned with the Hellinikon and Faliro Bay openings creates the potential to benefit fully from the mega-project halo effect.


Download the PDF version of this report



Contactrealestate@avla.com.tr · +90 532 282 2657 · Avla Gayrimenkul A.Ş.

Comments


bottom of page